Close Menu
    What's Hot

    CIFF Guangzhou 2026 Wraps Up, Strengthening Global Links Across the Complete Home Industry Chain

    April 3, 2026

    Cool, Calm, Connected: Meet the Refrigerator Designed for Real Life

    April 3, 2026

    McDonald’s Türkiye Introduces ‘Archie’ for Gamers

    April 3, 2026
    Arab BeaconArab Beacon
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Arab BeaconArab Beacon
    Home » O’Leary Digital Forms Joint Venture to Advance 7.5 GW Wonder Valley Utah Campus; Alberta Permitting Underway
    PR Newswire

    O’Leary Digital Forms Joint Venture to Advance 7.5 GW Wonder Valley Utah Campus; Alberta Permitting Underway

    February 18, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    26,000 Acres Under Development in Two Jurisdictions Supporting 15 Gigawatt Initial Power Plan

    MIAMI, Feb. 18, 2026 /PRNewswire/ — O’Leary Digital Limited today announced the formation of a strategic joint venture with West GenCo LLC to advance development of Wonder Valley Utah, a large-scale powered compute campus located in Utah. West GenCo will oversee permitting and state-level regulatory coordination for the project.

    In parallel, O’Leary Digital confirmed that permitting is underway for Wonder Valley Alberta, located in Grande Prairie, Alberta.

    Together, the two projects anchor O’Leary Digital’s broader powered compute and integrated energy infrastructure platform designed to meet accelerating demand for artificial intelligence and hyperscale cloud infrastructure.

    Across Utah and Alberta, O’Leary Digital has under development approximately 26,000 acres positioned for long-term infrastructure buildout.

    15 Gigawatts — Initial Master Plan

    Each Wonder Valley campus is planned for 7.5 gigawatts of power generation capacity, supported by phased deployment of powered buildings and integrated on-site energy and utility infrastructure.

    Combined, the two sites represent a 15-gigawatt initial power plan, with the ability to scale over time based on tenant demand and infrastructure buildout.

    Based on publicly available information, O’Leary Digital believes this represents the largest integrated powered compute infrastructure development currently underway globally.

    Kevin O’Leary, Chairman of O’Leary Digital, said:

    “We have under development approximately 26,000 acres across two jurisdictions with the infrastructure necessary to support power generation and compute capacity at scale. In Utah particularly, the energy resources and location create a compelling long-term opportunity. We recognize the leadership demonstrated by Governor Spencer J. Cox, Senate President J. Stuart Adams, and Utah’s federal delegation including Senators Mike Lee and John R. Curtis. Projects of this magnitude require disciplined execution and close collaboration with state and local leadership, and we are committed to working in partnership as the project advances.”

    Strategic Positioning

    Wonder Valley Utah benefits from access to major interstate natural gas infrastructure and proximity to aerospace, defense, and advanced manufacturing ecosystems. The location is designed to support secure, high-performance computing environments aligned with enterprise and mission-critical applications.

    Wonder Valley Alberta is positioned to leverage Western Canada’s energy resources and infrastructure base, supporting long-duration power development and large-scale compute deployment.

    Both campuses are designed to accommodate dedicated single-tenant campuses or segmented multi-tenant configurations.

    Representative Designs and Flexible Deployment

    Representative campus and building designs have been developed to align with established hyperscale standards, while allowing flexibility to tailor power density, cooling systems, and infrastructure configurations to tenant requirements.

    Paul Palandjian, Chief Executive Officer, said:

    “We have developed repeatable campus designs supported by experienced partners with deep expertise and long track records serving leading compute tenants, while preserving the flexibility to collaborate directly on specific power and infrastructure requirements. In a rapidly evolving compute environment, combining scalability with adaptability is essential.”

    Execution Team

    Gensler — Architecture and Master Planning
    KPMG — Financial and Tax Advisory
    InPwr Inc. — Electrical Infrastructure and Mission-Critical Systems
    CenCore Group — Campus and Data Center Security
    Kent Data Centers (formerly Sudlows) — Data Center Design and Engineering
    PCL Construction — Construction Manager (Alberta)
    Clayco — CM / General Contractor (Utah)

    Capital Formation

    O’Leary Digital has capitalized both Wonder Valley Utah and Wonder Valley Alberta to advance each project through permitting and toward shovel-ready execution.

    The company has retained a blue-chip roster of leading global investment banks to serve as capital markets advisors in structuring and securing project-level equity and debt financing for both developments.

    Alberta Engagement

    In Alberta, O’Leary Digital has commenced engagement with Indigenous communities whose traditional lands fall within the Greenview Industrial Gateway, where the proposed Wonder Valley Alberta project is located.

    O’Leary added:

    “The Greenview Industrial Gateway sits within lands that have long been part of Indigenous communities’ traditional territories. Engagement, consultation, and shared opportunity are foundational to how we approach development in Alberta.”

    Media Contact

    Nancy Cheung
    nancy@olearyglobal.com

    About O’Leary Digital

    O’Leary Digital is developing a long-term powered compute and integrated energy infrastructure platform anchored by Wonder Valley Utah and Wonder Valley Alberta. The platform is designed to support large-scale artificial intelligence and hyperscale cloud deployments through phased infrastructure development, institutional execution, and strategic energy integration.

    Cision View original content:https://www.prnewswire.co.uk/news-releases/oleary-digital-forms-joint-venture-to-advance-7-5-gw-wonder-valley-utah-campus-alberta-permitting-underway-302691072.html

    Related Posts

    CIFF Guangzhou 2026 Wraps Up, Strengthening Global Links Across the Complete Home Industry Chain

    April 3, 2026

    Cool, Calm, Connected: Meet the Refrigerator Designed for Real Life

    April 3, 2026

    McDonald’s Türkiye Introduces ‘Archie’ for Gamers

    April 3, 2026

    Peace and Sport has launched the 2026 #WhiteCard global campaign

    April 2, 2026

    CycleFlow powered by C2FO and IFC Launch Supply Chain Finance Platform in Nigeria, Transforming Access to Finance for Nigerian MSMEs

    April 2, 2026

    Redefining Work-from-Home Comfort with LG StanbyME series

    April 2, 2026
    Editor's Pick

    South Korea inflation hits 2.2% in March on oil surge

    April 2, 2026

    Ternate earthquake triggers tsunami alert, leaves one dead

    April 2, 2026

    Northern China coal mine roof collapse kills four

    April 2, 2026

    Japan factory output drops 2.1 percent in February

    April 1, 2026
    © 2026 Arab Beacon | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.